Channel: CUBIX PROJECT MANAGEMENT - 3D Work Breakdown Structure method
Browsing all 86 articles
Browse latest View live

Image may be NSFW.
Clik here to view.

Part #132: how to define the relationships in WBS matrix?

We know how to define the tasks and the durations efficiently simply by crossing the elementary tree structures Products (PBS), Activities (ABS) and Zones (ZBS) in interfaces matrix. We can use the WBS...

View Article



Image may be NSFW.
Clik here to view.

Part #133: Why to identify the interfaces?

3D WBS method is the only method that allows to identify the interfaces of a project.The three elementary tree structures of the WBS are projected on the axis of the WBS cube, and then, after the...

View Article

Image may be NSFW.
Clik here to view.

Part #134: And the Costing?

Costing is usually calculated by Products. In fact, there is also the Activity which is usually “Construction”. It is a macro level activity; sometimes we do not name it because it is obvious that we...

View Article

Image may be NSFW.
Clik here to view.

Part #135: The foundation is the standard…

If you take a piano, well for example between C and D there are 1.5 tone, and between E and F there is a semitone. that's the standard. Now if you take your hand and you put it on the piano keys so...

View Article

Image may be NSFW.
Clik here to view.

Part #136: Overall project structuration in a multidimensional way

Sometimes the goal of the project is to finish the project as earliest as possible, sometimes it is to finish it with the lowest cost, sometimes it is to obtain the best Product with a high quality and...

View Article


Image may be NSFW.
Clik here to view.

Part #137: 3D WBS lecture at Swiss Project Management association, remenbrances

I did a lecture about 3D WBS method the 9 September 2014 at Lausanne in Swiss. It was very nice.Cubix360...Functional needs of Project Management...Before the lecture...

View Article