Quantcast
Channel: CUBIX PROJECT MANAGEMENT - 3D Work Breakdown Structure method
Viewing all articles
Browse latest Browse all 86

Part #135: The foundation is the standard…

$
0
0
If you take a piano, well for example between C and D there are 1.5 tone, and between E and F there is a semitone. that's the standard. Now if you take your hand and you put it on the piano keys so that between the first and second finger there is 1.5 tone, and between the second and third finger there is one tone, well you get a major chord. If between the first and second finger there is 1 tone, and between the second and third finger there is 1.5 tone, well you get a minor chord. That's the method. And the piano is the tool.


The tool needs the method that requires the standard.


  • The toolsare Primavera P6, Spider Project, MS Project, Costing tools, 4D BIM, etc.
  • The methodis the 3D WBS.
  • And the standard is OmniClass, Uniclass2, ISO12006, Norsok Z-014, KKS, ..., and internal standards (crossing PBS x ABS).
Do not go faster than the musik !




Viewing all articles
Browse latest Browse all 86

Latest Images

Trending Articles





Latest Images