Quantcast
Channel: CUBIX PROJECT MANAGEMENT - 3D Work Breakdown Structure method
Viewing all articles
Browse latest Browse all 86

Part #120: Star tetrahedron projects !

$
0
0
As Garrett Lisi’s theory of everything, 8 dimensions can be envisaged for a project.

In blue, the SCOPE dimensions of the 3D WBS : PBS (what?), ABS (How?), ZBS (Where?), and configuration management (For what?).

In red, the VALUE dimensions of the 3D WBS: OBS/RBS (Who?), Cost (How much?), Time (When?), and Value of the Project/Product (Why?).

For reasons of clarity, the dimensions are reduced to a point.


Thanks to Doctor Paul D. Giammalvo for his initial idea: 

Thanks to Stephen A. Decaux for his help, last book 
"Managing projects as investments":


Viewing all articles
Browse latest Browse all 86

Trending Articles