Part #91: Three reasons to use Cubix360 software

$
0
0

Cubix360 use 3D Work Breakdown Structure method (3D WBS) and propose to build a schedule very methodically. First, the Product Breakdown Structure (PBS) is created, then the Activity Breakdown Structure (ABS) and then the Zone Breakdown Structure (ZBS). Activities are deployed on Products that are assigned into a Zone. The three kind of logical links, Zone, Product and Activity are created, and the durations are defined function of the crossing Product-Activity and the Zone. Finally, the schedule is generated into MS PROJECT or PRIMAVERA P6. Cubix360 propose a real method to build a schedule compared to a traditional approach.


Cubix360 allows to create very high quality schedules. The task name is very clear, it is in the form “Zone-Product-Activity”. This is compliant with the task definition which is “To do – Something - Somewhere”. Each task has a code Zone, Product and Activity of different levels. This codification make the schedule very structured and allows to groups, filters and sorts the tasks in order to find easily the information. The schedules created with Cubix360 are multi-dimensional.


Cubix360 allows to create a schedule faster than a traditional approach. The Products factorization inside the Cubix360’s matrix, and also the importation of the elementary tree structures from EXCEL, allow to earn time for the schedule construction, with a factor 5 to 10, function of the complexity of the project.






Viewing all articles
Browse latest Browse all 86

Latest Images

Trending Articles





Latest Images